Delta Dual V4/V6
11.0
Installation of Chamber - Section B2
Connecting perimeter channel to chamber
To be followed when installing perimeter channel directly into upper side of chamber.
9
Mark perimeter channel position on side of chamber.
11
Cut around the marked line outlining the perimeter
channel using a jigsaw.
12
10
Drill holes in the corners inside the area marked in red.
12
Insert the perimeter channel into the chamber allowing
35mm of overhang inside the chamber.
For technical support, please call 01279 757400