11.0
Installation of Chamber - Section E
Installing pumps and high level alarm in chamber
31
Pump out water from chamber.
33
Remove discharge arms from 'Y' piece manifold and
screw 'Y' piece on to gatevalve. Ensure gatevalve is
fully open.
For technical support, please call 01279 757400
32
Manually remove any debris from chamber and
residual water using a wet vac.
34
Wrap PTFE tape around thread located on male irons
at the bottom of the discharge arms and screw
discharge arms on to pumps.
Delta Dual V4/V6
19