Chapter 4. Completing your installation
Perform the following steps to return complete your installation:
1. Make sure that you have reinstalled all of the covers on the following system
DANGER
2. Plug the power cords for the following system components into electrical
3. Turn power on to each of the following system components by using the
Figure 26. Normal Mode
© Copyright IBM Corp. 1999, 2000
components:
a. AS/400 system unit.
b. All system expansion units.
An electrical outlet that is not correctly wired could place hazardous voltage
on metal parts of the system or the products that attach to the system. It is the
customer's responsibility to ensure that the outlet is correctly wired and
grounded to prevent an electrical shock. (RSFTD201)
outlets:
__ a. The AS/400 system unit.
Note: If you are setting up a 5066 and the power cords are two different
lengths, install the longer power cord into the upper unit.
__ b. All expansion units attached to the system.
__ c. The system unit console.
__ d. The system printer.
associated power-on button:
a. The system printer (if present).
b. The system control console.
c. Ensure that the system is in normal mode, Figure 26.
d. Turn on the AS/400 system unit by pushing the white power-on button.
Note: The time needed to do a complete IPL varies depending on AS/400
model and configuration.
e. Sign on the system unit. Ensure that you have service tools authority.
23