Vionic Encoder System Quick-Start Guide - Renishaw VIONiC RTLC20-S Installation Manual

Linear encoder system
Table of Contents

Advertisement

The optional Advanced Diagnostic Tool ADTi-100
Move the readhead along the scale at slow speed (< 100 mm/s), without passing a reference mark, until the LED starts double flashing Blue.
If a reference mark is not being used, the calibration routine should now
be exited by cycling the power. The LED will stop flashing.
The system is now calibrated and ready for use. Calibration values, Automatic Gain Control (AGC) and Automatic Offset Control (AOC) status are stored in readhead non-volatile memory at power down.
NOTE: If calibration fails, restore factory defaults by obscuring the readhead optical window on power-up
VIONiC RTLC20-S installation guide

VIONiC encoder system quick-start guide

This section is a quick-start guide to installing a VIONiC encoder system.
More detailed information on installing the system is contained on
Ensure scale, readhead optical window and mounting faces are clean and free from obstructions.
If required, ensure reference mark selector magnet is correctly positioned
Connect the readhead to receiving electronics and power‑up. The set‑up LED on the readhead will flash.
Install and align the readhead to maximise signal strength over the full axis of travel as indicated by a Green flashing LED.
Cycle the power to the readhead to initiate the calibration routine. The LED will single flash Blue.
No reference mark
*
For more details refer to the Advanced Diagnostic Tool ADTi-100 and ADT View software quick-start guide (Renishaw part no. M-6195-9321) and
Advanced Diagnostic Tool ADTi-100 and ADT View software user guide (Renishaw part no. M-6195-9413).
The software can be downloaded for free from
page 8
and
page 9
*
(A-6165-0100) and ADT View software
can be used to aid installation and calibration.
INSTALLATION
(see 'RTLC20-S scale installation drawing' on page
CALIBRATION
Move the readhead back and forth over the selected reference
(see page
www.renishaw.com/adt
of this installation guide.
4).
Reference mark
mark until the LED stops flashing.
9). Repeat the installation and calibration routine.
7

Advertisement

Table of Contents
loading

Table of Contents