Status LED Indications

Table 7-1 LED indications during the NPBA-12 start-up sequence.
Start-up Stage
Power-on
OFF
OFF
GREEN then RED then OFF
DDCS link
OFF
initialisation
Transfer rate
FLASHING GREEN (in progress)
detection
then GREEN
PROFIBUS
GREEN
communication
establishment
Operation
GREEN
NPBA-12 Installation and Start-up Guide
The tables below describe the Status LED indications during both the
start-up sequence and operation.
MASTER
OFF
GREEN then RED then OFF
OFF
OFF
OFF
FLASHING GREEN (in progress)
then GREEN
GREEN
Chapter 7 – Fault Tracing
Status LED Indications
MSG
DDCS
GREEN then RED then OFF
OFF
OFF
FLASHING GREEN (in progress)
then GREEN
GREEN
GREEN
GREEN
7-1