Screen 4.
Etot: Total energy (kWh) delivered by the inverter to the Power grid since it was shipped from the factory. The recording of the
inverter serial number marks the start of the energy log.
T.Con: The number of hours that the inverter has been connected to the Power grid.
Num.Con: The number of grid connections made during operating hours.
Screen 5.
E.Par: Total energy (kWh) delivered by the inverter to the Power grid since the last counter reset.
T.ConP: The number of hours that the inverter has been connected to the Power grid since the last counter reset.
N.ConP: The number of grid connections made since the last counter reset.
Screen 6.
FW Ver: Inverter firmware version.
DFWVer: Inverter display firmware version.
D. Boot: Firmware boot version.
3.5
Configuration
To check which country / standards the inverter has been configured for. Access restricted to the installer.
STOP
Never change those equipment parameters that can be accessed through this section.
3.6

Language Selection

Once the monitoring menu MONITORIZACIÓN has been selected, click on
12:00
MAIN MENU
Monitoring
Configuration
Language
Change date
The language can be changed through this menu. The
keys can be used to select the desired language. To select,
position the cursor over the desired language and click once on
OK . The following on-screen prompt will appear:
Click on OK once more, to confirm the language selected.
AAY2000IKE01
Rev. _
Date: MArch 2011
12/04/10
12:00
Spanish
English
German
Italian
12:00
and
Language
Continue?
OK to access the language menu:
12/04/10
LANGUAGE SELECTION
12/04/10
LANGUAGE SELECTION
English
Ok
Page 19 of 68

Advertisement

loading