4.1 Turn on UPS
Note:
Battery is fully charged after manufacture, but energy may be loss
after transportation and storage. Suggest charge the battery for 12
hours or more before using, to ensure enough backup time.
Prepare to turn on
1) Connect main power and close battery switch, then turn bypass
protect switch to "ON" side. If the battery cell numbers displayed in
the LCD is different from actual, please call the SANTAK service
hotline or contract the distributor.
2) Turn input protect switch to "ON" side, check the information
displayed in the LCD. If any alarm or fault information display in
marked area, please call the SANTAK service hotline or contract
the distributor.
Note: Please turn off all the switch before maintenance.