Danger: For safety consideration, please make sure cut off all the
mains power.
Note:
1. Installation and power cable connection must be conducted by
qualified person according to local regulations.
2. We recommend UPSs installed as floor standing equipment.
3. After installation, ensure the air vents on the front, side and rear of
the UPS are not blocked. Recommended at least 50cm of space on each
side.
4. If it is necessary to connect the inductance load such as a monitor
or a laser printer to the UPS, the start-up power should be used for
calculating the capacity of the UPS, as its start-up power consumption is too
big when it is started.

2.1 Inspection the pack and equipment.

1. Open UPS pack, inspection whether UPSs have been damaged
during shipment.
2. If find any equipment damaged, please contact your local
SANTAK representative.
Accessory: 1 pcs of user manual.
Recycle
The UPS package is recycling, please save it for further use.

2.2 Power cable.

Note:
The diameter and cross-sectional area denpends of power cable
depend on the UPS rating power, the minim diameter and cross-sectional
area of power cable see below power cable table.

2. Installation