Power Cable Connections On The Back Of The - IBM StorVize V7000 Gen2 Quick Installation Manual

Table of Contents

Advertisement

2. Secure the power cables in the cable retainer at each power connector on the
Figure 118. Power cable connections on the back of the expansion enclosure
3. Verify that the expansion enclosure and its components are operating as
rear of the enclosure. Also, ensure that each cable is installed along one of the
cable management arms. The cable management arms also support the SAS
cables.
Important: Always secure each power cable with a cable retainer and ensure
that the cable is installed along one of the cable management arms. When
secured, the power and SAS cables stay connected when you slide the
expansion enclosure out of the rack to perform service tasks.
expected.
On the back of the expansion enclosure, all four fans and the expansion
canister indicators ( 3 and 8 in Figure 119 on page 130) become active when
the power is connected.
Chapter 2. Installing the Storwize V7000 Gen2 and Storwize V7000 Gen2+ hardware
1
2
129

Advertisement

Table of Contents
loading

This manual is also suitable for:

Storvize v7000 gen2+

Table of Contents