Ene rgize /St a rt up
Proc e dure s
Pre -st a rt up Proc e dure s:
1. Double-check all wiring connections.
2. Inspect the enclosure to ensure no
tools or debris has been left inside.
3. Disconnect all AC loads at the
backup (or critical) load panel.
4. Disconnect the AC input feed to
the GSLC at the source.
4
T o e ne rgize or st a rt t he Out Ba c k de vic e s:
1.
Using a digital voltmeter (DVM), verify 48 Vdc
on the DC input terminals by placing the DVM leads
on
and
.
1 a
1 b
Confirm that the battery voltage is correct for the
inverter and charge controller models.
Confirm the polarity.
CAU T I ON : Equipm e nt Da m a ge
!
Incorrect polarity will damage
the equipment.
1
2.
Turn on (close) the GFDI circuit breaker.
3.
Verify that the PV output for each charge controller
is in the correct range of open-circuit voltage and
confirm the polarity by:
2 a
2 b
a) placing the DVM leads on
and
, and
b) placing the DVM leads on
and
.
2 a
2 c
4.
Turn on (close) the PV input circuit breakers.
2
5.
Turn on (close) the DC circuit breakers from the battery bank to the inverter.
4
6.
If the inverter is in the Off state, turn it On.
7.
Verify 120 Vac on the AC Output L1 TBB by placing the DVM leads on
8.
Verify 120 Vac on the AC Output L2 TBB
3 b
and
3 c
9.
Verify 240 Vac between the AC Output TBBs by placing the DVM leads on
10. Turn on (close) the AC output circuit breakers.
5
11. Start the generator if appropriate. Verify 120/240 Vac on the terminals of the AC input sources.
12. Turn on the AC input feed to the GSLC at the source.
11. Verify 120 Vac on the GRID IN L1 TBB by placing the DVM leads on
12. Verify 120 Vac on the GRID IN L2 TBB
and
4 b
3 c
13. Verify 240 Vac between the GRID IN TBBs by placing the DVM leads on
14. Verify 120 Vac on the GEN IN L1 TBB by placing the DVM leads on
15. Verify 120 Vac on the GEN IN L2 TBB
and
5 b
3 c
16. Verify 240 Vac between the GEN IN TBBs by placing the DVM leads on
17. Turn on (close) the AC input circuit breakers.
6
18. Turn on the AC disconnects at the backup (or critical) load panel and test the loads.
900-0153-01-00 Rev A.vsd\ Page-3\ 2013-01-17
© 2012 OutBack Power Technologies. All Rights Reserved.
Func t iona l
T e st Point s
Battery Voltage Test Points
PV Voltage Test Points
AC OUT Voltage Test Points
(Terminal bus bar = TBB)
3 a
GRID IN Voltage Test Points
(Terminal bus bar = TBB)
4 a
GEN IN Voltage Test Points
(Terminal bus bar = TBB)
5 a
2 a
5
1 b
6
3
6
In
23.2 V
0.0 A
Out
27.6 V
0.0 A
3 a
0.000 kW
0.0 kWH
4 a
5 a
1 a
AUX:
OFF
Sleeping
2 b
1
3 c
2
2 c
4 b
5 b
3 b
3
and
.
3 a
3 c
.
and
.
3 a
3 b
4 a
and
3 c
.
.
and
.
4 a
4 b
and
.
5 a
3 c
.
and
.
5 a
5 b
De -e ne rgize /Shut dow n
Proc e dure s
1 a
1 b
2 a
2 b
2 c
3 b
3 c
4 b
3 c
5 b
3 c
In
23.2 V
0.0 A
Out
27.6 V
0.0 A
0.000 kW
0.0 kWH
AUX:
OFF
Sleeping
WARN I N G: Burn H a za rd
Internal parts can become hot
during operation. Do not
remove the cover during
operation or touch any internal
parts. Be sure to allow them
sufficient time to cool down
before attempting to perform any
maintenance.
WARN I N G: Le t ha l V olt a ge
Review the system configuration to identify all
possible sources of energy. Ensure ALL
sources of power are disconnected before
performing any installation or maintenance on
this equipment. Confirm that the terminals are
de-energized using a validated voltmeter
(rated for a minimum 1000 Vac and 1000 Vdc)
to verify the de-energized condition.
WARN I N G: Le t ha l V olt a ge
The numbered steps will remove power from
the inverter and charge controllers. However,
sources of energy may still be present inside
the GSLC and other locations. To ensure
absolute safety, disconnect ALL power
connections at the source.
RADIAN Series
Func t iona l
T e st Point s
Battery Voltage Test Points
1 a
1 b
PV Voltage Test Points
2 a
2 b
AC OUT Voltage Test Points
(Terminal bus bar = TBB)
3 a
1 c
1 d
2 a
1 b
1
1
2
In
23.2 V
0.0 A
In
23.2 V
Out
27.6 V
0.0 A
Out
27.6 V
3 a
0.000 kW
0.0 kWH
0.000 kW
AUX:
OFF
Sleeping
AUX:
OFF
4
2 e
3 c
3
3 b
2 d
Test points 2d and 2e refer to the
right terminal of each circuit breaker.
T o de -e ne rgize or shut dow n t he Out Ba c k de vic e s:
1.
Turn off (open) the AC circuit breakers.
2.
Turn off (open) the DC circuit breakers for the battery.
Wait 5 minutes for the devices to internally discharge themselves.
3.
Turn off (open) the PV circuit breakers.
4.
Turn off (open) the GFDI circuit breaker.
5.
Verify 0 Vdc on the first DC bus of the inverter by placing the
voltmeter leads on
and
.
1 b
1 c
6.
Verify 0 Vdc on the second DC bus by placing the voltmeter leads
on
and
.
1 b
1 d
7.
Verify 0 Vdc on one PV circuit by placing the voltmeter leads on
and
.
2 d
8.
Verify 0 Vdc on the other PV circuit by placing the voltmeter leads
on
and
.
2 a
2 e
9.
Verify 0 Vac on the AC output circuit breakers by placing the
voltmeter leads on
and
. Repeat this step for
3 a
3 c
1 c
1 d
2 c
2 d
2 e
3 b
3 c
0.0 A
0.0 A
0.0 kWH
Sleeping
1
2
3
4
2 a
and
.
3 b
3 c
Need help?
Do you have a question about the RADIAN Series and is the answer not in the manual?
Questions and answers