Roof Termination Cap Installation-With And Without Damper - Heat&Glo FOUNDATION Series Installation And Operating Manual

Single sided co-linear direct vent gas fireplaces
Hide thumbs Also See for FOUNDATION Series:
Table of Contents

Advertisement

H. ROOF TERMINATION CAP INSTALLATION - WITH AND WITHOUT OPTIONAL DAMPER
Roof Termination Without Optional
Mechanical Damper
INSULATION PAD MUST BE CUT IN
CENTER TO ACCOMMODATE VENT SIZE.
PLACE FOIL SIDE UP.
Figure 8H.1
Roof Termination With Optional
Mechanical Damper
INSULATION PAD MUST BE CUT IN
CENTER TO ACCOMMODATE VENT SIZE.
PLACE FOIL SIDE UP.
OPTIONAL
Figure 8H.2
26
Heat & Glo • FDN-4-SS, FDN-5-SS, FDN-6-SS, FDN-7-SS Installation Manual • 16400-9800 Rev. H • 11/19
8 - VENTING
POWERVENT
MOUNTING BRACKETS
OR DRILL MOUNTING
HOLES TO MATCH
BASE
STEEL CHIMNEY ADAPTER
POWERVENT
MOUNTING BRACKETS
OR DRILL MOUNTING
HOLES TO MATCH BASE
OPTIONALMECHANICAL
FLUE DAMPER

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fdn-4-ssFdn-5-ssFdn-6-ssFdn-7-ss

Table of Contents