NOTE: The qualified installer should follow the procedure best suited for the installation.
C. INSTALLATION OVERVIEW
1.
Framing should be built after the fireplace is installed or extra clearance must be planned for at the intake collar. Framing must allow for vent
installation.
2.
If masonry (optional) will be used, prepare foundation for the masonry load. A lintel is required to support the added weight above the fireplace.
3.
Install hearth if desired.
4.
Insert fireplace into framing.
5.
Double check clearances to combustibles.
6.
Complete gas line installation.
7.
Complete electrical hook-up.
8.
Complete venting installation.
9.
Install facing material, mantel or cabinetry.
10. Install optional mirrored glass, optional logs, media, and required glass.
11. Verify proper operation of fireplace and all components.
D. PLACEMENT CLEARANCE REQUIREMENTS
This fireplace must be installed on a level surface capable of supporting the fireplace and venting.
Fireplace must be placed directly on wood or non-combustible surface (not linoleum or carpet) extending entire depth and width of fireplace.
Due to high surface temperatures, fireplace should be located out of traffic and away from furniture and draperies.
This fireplace may be installed in a bedroom.
Heat & Glo • FDN-4-SS, FDN-5-SS, FDN-6-SS, FDN-7-SS Installation Manual • 16400-9800 Rev. H • 11/19