Beckhoff CP71 Series Installation And Operating Instructions Manual

Beckhoff CP71 Series Installation And Operating Instructions Manual

Advertisement

Installation and Operating instructions for
Panel-PC CP71xx
Version: 1.2
Date:
2006-03-06

Advertisement

Table of Contents
loading

Summary of Contents for Beckhoff CP71 Series

  • Page 1 Installation and Operating instructions for Panel-PC CP71xx Version: 1.2 Date: 2006-03-06...
  • Page 3: Table Of Contents

    First switching on and driver installation UPS Software Components (optional) Installation on the PC Help files Maintenance Cleaning the Industrial PC Replacing the battery on the motherboard Servicing Shutting down Disposal Troubleshooting Fault correction Service support Beckhoff Service Beckhoff Support Company headquarters CP71xx...
  • Page 4 Table of contents Assembly dimensions Appendix Technical data Approvals FCC: Federal Communications Commission Radio Frequency Interference Statement FCC: Canadian Notice CP71xx...
  • Page 5: General Notes

    © This documentation is protected by copyright. Any reproduction or third party use of this publication, whether in whole or in part, without the written permission of Beckhoff Automation GmbH, is forbidden. Description of safety symbols The following safety symbols are used in this operating manual. They are intended to alert the reader to the associated safety instructions.
  • Page 6: Basic Safety Measures

    General Notes Basic safety measures Only switch the PC off after Before the Industrial PC is switched off, software that is running must closing the software be properly closed. Otherwise it is possible that data on the hard disk is lost. Please read the section on Switching the Industrial PC on and off.
  • Page 7: Operator's Obligation To Exercise Diligence

    General Notes Operator's obligation to exercise diligence The operator must ensure that • the Industrial PC is only used for its intended use (see also Product Description chapter). • the Industrial PC is in a sound condition and in working order during operation.
  • Page 8: Product Description

    Product Description Product Description Appropriate Use The water protected Panel-PC CP71xx with plug-in card motherboard is designed for mounted behind a Beckhoff Control Panel. Structure Rear view of the CP71xx Opening the housing In order to open the PC housing, first remove the two M4 screws (1) using a combination wrench SW 7 and the Allen screw (2) using a No.2 Allen key...
  • Page 9: Access To The Drives

    Product Description Rapid access to integrated components After removing the fastening screws the inner chassis can be taken off, thus providing access to the processor with cooling ribs and fan (1), memory (2), plug-in cards (3), floppy disk drive (4), CD-ROM drive (5) (optional) and Status-LEDs (6).
  • Page 10: Interfaces

    Product Description Interfaces Interfaces to the add-on Panel PC CP71xx USB interfaces USB1, USB2 The two USB interfaces (1) and (2) are used for connecting peripheral devices with USB port. USB 2.0 standard is supported. Network connection Network Two 10/100 Base-T RJ-45 connectors (3) allow the PC to be connected to a Local Area Network (LAN).
  • Page 11: Installation Instructions

    4. Please keep the associated paperwork. It contains important information for handling the unit. 5. Check the contents for visible shipping damage. 6. If you notice any shipping damage or inconsistencies between the contents and your order, you should notify Beckhoff Service. CP71xx...
  • Page 12: Installation Of The Pc

    Installation Instructions Installation of the PC The Panel PC series CP71xx is designed for mounting arm installation. A Control Panel is installed in the front of the Panel PC. The ambient conditions specified for operation must be observed (see the section Technical data).
  • Page 13: Power Supply Connection

    Installation Instructions Power Supply Connection Supplied mains power unit The Industrial PC is fitted with a 24 V power supply unit . Optional an uninterruptible power supply (UPS) can be realized using the battery pack C9900-U330. Danger of Explosion if using other battery packs! Danger Electrical data Input voltage:...
  • Page 14: Fitting The Cable

    Installation Instructions Fitting the cable Wiring in accordance with Fit the cables for the power supply of the Industrial PC, the connection of wiring diagram the battery pack as well as the connection of the power-switch in accordance with the wiring diagram, using the included material for assembling the connectors.
  • Page 15: Connecting Power Supply

    Installation Instructions Connecting Power Supply The external wiring consists of the connection of the power supply, the battery pack (optional) and the connection of customized components for shutting down the PC. Cable Cross Sections Note cable cross sections, For the connection of the power supply, wiring with a cable-cross-section of 1,5 mm must be used.
  • Page 16: Connecting Devices

    Installation Instructions Connecting devices The power supply plug must be withdrawn! Warning Please read the documentation for the external devices prior to connecting them. During thunderstorms, plug connector must neither be inserted nor removed. When disconnecting a plug connector, always handle it at the plug. Do not pull the cable! Connecting cables The connections are located behind the outer housing of the Industrial PC...
  • Page 17: Operating Instructions

    Operating Instructions Operating Instructions Switching the Industrial PC on and off Switch on The Industrial PC does not have its own mains switch. The Industrial PC will start when the equipment is switched on, or when it is connected to the power supply.
  • Page 18: Ups Software Components (Optional)

    The help files can be called up either directly from the configuration register by clicking the Help button, or under via Start > Programs > Beckhoff > UPS software components. Please note that the background illumination of the Panel is not switched on in the case of activation power supply of the Industrial PC over the UPS.
  • Page 19: Maintenance

    Operating Instructions Maintenance Please also refer to chapter General Notes. Cleaning the Industrial PC Switch off the Industrial PC and all connected devices, and disconnect the Industrial PC from the power supply. Danger The Industrial PC can be cleaned with a soft, damp cloth. Do not use any aggressive cleaning materials, thinners, scouring material or hard objects that could cause scratches.
  • Page 20: Troubleshooting

    No power supply to the Check power supply cable PC has been switched on Industrial PC Other cause Call Beckhoff Service The Industrial PC does not boot Floppy disk or CD in the drive Remove floppy disk or CD fully...
  • Page 21: Service Support

    Beckhoff and their partners around the world offer comprehensive service and support, making available fast and competent assistance with all questions related to Beckhoff products and system solutions. Beckhoff Service The Beckhoff Service Center supports you in all matters of after-sales service: • on-site service •...
  • Page 22: Assembly Dimensions

    Assembly dimensions Assembly dimensions The illustrations show the measurements of the Panel-PCs. Please refer to the tables for the dimensions of the Control Panel. All Dimensions in mm. Mounting arm Rolec Display only Dimensions CP7100 10“ Display 353,8 308,3 29,5 CP7101 12“...
  • Page 23: Appendix

    Appendix Appendix Technical data Dimensions Dimensions (W x H x D): 236 x 291 x 186 mm (without Control Panel) Weight: 11,5 kg (basic configuration, without Control Panel) Do not use the PC in areas The Industrial PC must not be used where there is a risk of explosion. of explosive hazard The following conditions must be observed during operation: Environmental conditions...

Table of Contents