4. Starting up the product

1. Set the selector switches to OFF.
2. Switch on the power supply.
3. When the display is active, select the tank inlet height.
4. Set the rated motor current according to the nameplate.
5. Open the outlet and inlet valves.
6. Set the selector switches to AUTO.
7. Flush a toilet or open a tap connected to the tank.
8. Check that the liquid level reaches the start level.
9. Check that the system starts and stops automatically at least twice.
It takes up to 45 seconds to boot the controller.
If the inlet height is between two values, select the lower value.
The controller sets the start levels, the stop level and the high-level alarm according to the
inlet height selected.