Draining The Boiler And Hot-Water Cylinder; Adjustments On The Main Pcb; Tømning Af Kedlen Og Varmtvandsbeholderen; Justering Af Hovedprintet - Baxi NUVOLA 28 Fi Installers And Users Instructions

High efficiency, fast-heating gas boilers with balanced flue for wall-mounting
Table of Contents

Advertisement

Draining the boiler and hot-
water cylinder
Draining the hot-water cylinder
• Close the cold water
Picture D
inlet tap to the cylinder.
Billede D
• Open a hot water oulet
tap as close to the boiler
as possible.
• Remove the drain
screw (l) to the hot-
water cylinder and
ensure you collect the
dræningsventil ( ❍ )
water contained in the
cylinder (60 litres).
drainage valve (G)
Draining the boiler
aftapningsstuds ( G )
• Close the stop valves
on flow and return.
• Remove the drain
screw (m) placed at the
zone valve and ensure
you collect all the water
contained in the boiler.
Under no circumstances should the drainage operation be carried out via
the boiler and hot-water cylinder safety valves.

Adjustments on the main PCB

Note: The adjustments described in this section may be effected by
dismantling the caps on the control panel cover without removing the
cover itself.
* P3 MAX RISC (max. central
heating) potentiometer
By operating on this potentiometer it
is possible to adjust the central heating
output by means of a 2.5x0.4 mm
screwdriver.
For details on the burner pressure
values in relation to the heat output
see the tables on page 28.
* P4 RLA potentiometer to adjust
the start-up gas quantity
By operating on this potentiometer it
is possible to adjust the burner's jet
pressure during lighting with a 2.5x0.4
mm blade screwdriver.
This operation may be necessary in the
case of a pulsating start.
To facilitate adjustment of the RLA,
the pressure to the burners can be
maintained steady during this phase
for a period of around 3 minutes,
proceeding as described below:
- move the selector (1) to position (0);
- disconnect the NTC heating probe (24);
- move the selector (1) to the summer (
- reconnect the NTC probe;
- check that the system requires heat;
- adjust the RLA accordingly.
The boiler should now operate correctly again.
boiler drainage
valve (❍)
kedlens
storage cylinder
beholderens
) or winter (
Tømning af kedlen og
varmtvandsbeholder
Tømning af varmtvandsbeholderen
Aftapning/dræningen må under ingen omstændigheder foretages via
kedlens og varmtvandsbeholderens sikkerkedsventiler.
Justeringer af hovedprintet
Bemærk: Justeringerne beskrevet i denne sektion kan foretages ved at
afmontere dækslerne på kontrolpanellåget uden at fjerne selve låget.
- flyt vælgeren (1) til sommerdrift (
- tilslut atter NTC føleren,
- kontrollér, at systemet har behov for varme,
) position;
- justér RLA i overensstemmelse hermed.
Kedlen burde nu atter fungere korrekt.
26
921.968.2.00.02.010702
• Luk koldtvandshanen
til beholderen.
• Åbn
varmtvandshane så tæt
på kedlen som muligt.
• Fjern tømmeskruen
( G ) til varmtvands–
beholderen, og sørg
for at opsamle alt det
vand,
der
beholderen (60 liter).
by-
pass
Tømning af kedlen
• Luk stopventiler på
fremløb og retur.
• Fjern tømme skruen
( ❍ ) placeret ved
zoneventilen og sørg
for at opsamle alt det
vand, der er i kedlen.
* P3 MAX RISC (indstilling af max-
DELLASTYDELSE) potentiometer
Ved hjælp af dette potentiometer er
det muligt at justere centralvarme-
output med en 2,5x0,4 mm
skruetrækker.
For
yderligere
detaljer
brændertrykværdier i forhold til
varme-output se tabellerne på side 28.
* P4 RLA potentiomenter justering af
opstartgasmœngde
Ved hjælp af dette potentiometer er
det muligt at justere brænderens
dysetryk under tænding med en
2,5x0,4 mm skruetrækker.
Dette indgreb kan være nødvendigt
i tilfælde af pulserende start.
For at lette justeringen af RLA, kan
trykket til brænderne holdes konstant
under indgrebet i ca. 3 minutter, og
fremgangsmåden er som følger:
- flyt vælgeren (1) til position (0),
- afbryd NTC varmeføleren (24),
) eller vinterdrift (
en
er
i
om
),

Advertisement

Table of Contents
loading

Table of Contents