9. Assemble the pipes and push
them into the bend. Ensure that
the pipe with the grill is turned
so that it projects neatly.
10. Seal the opening around the pipe
on the internal wall.
11. Attach wall plates over the pipe
outside (if the opening fits ex-
actly, there is no need to use a
wall plate).
12. Mark up the openings.
13. Remove the plate, drill open-
ings, insert Rawlplugs (protect
the end of the pipe against dirt
from the drilling).
14. Remove cover which was used
to prevent dirt. Attach wall plate
and screw it tight.
Vertical displacement – V3
System
1. If you wish to have a vertical
displacement, this must be in-
serted between the bend and the
boiler.
2. The internal pipe for "vertical
displacement" must be shortened at the end opposite the "point".
3. The supplied set includes 2 transition pieces – pop rivets must not be
used with them.
VERTICAL BALANCED FLUE (L1, L2 AND L5 SYSTEM)
Where indicated by the conditions, use a VERTICAL balanced flue, which
means that the air is taken in and the flue gas is directed out at the same
place VERTICALLY above the roof.
The maximum length of the flue system is 7.5 m (minus 0.5 m per 45°
bend, minus 1 m per 90° bend).
The VERTICAL connecting set consists of:
1 connecting set Ø 60 / Ø 100 - Ø 100 / Ø 125
In addition, the following must be used:
1 ceiling flange for the end against the ceiling
1 roof duct with cover
A number of double pipes L=1000 or L=500
1 roof flashing 5-25° or 25-45°
If necessary
1 set of elbow pieces (2) -
2 elbow pieces
(if necessary, "top section for the chimney" as flashing
for flat roof = 091631)
Air intake / flue outlet – VERTICAL
Put the connecting set for vertical outlet on the
boiler's flue outlet.
Make the opening through the ceiling and roof
(protect the connecting set from getting dirty)
Measure the pipe length and shorten it.
If a parallel displacement of the vertical balanced
flue system is necessary, do this by inserting 2 x
45° elbow pieces as shown (if necessary, 2 x 90°
bends).
If necessary, a pipe section must be inserted
between the elbow pieces in order to achieve an
adequate displacement.
Fit the pipe through the roof and ceiling.
NB. Remember the ceiling flange.
Fit the roof flashing. Note: The black side on the
"Roof duct with cover" must go against the "tilt-
ing flange" on the roof flashing.
Secure the pipe to the roof structure.
Point the roof flashing with silicone.
Clamp
Spændebård
Clamp
Spændebård
45° for L1 system or
90° for L5 system
The internal pipe must be shortened at the
end opposite 'point'!
Afkortning af inderrør skal ske i ende modsat
"spids" !
Transition piece must face with the 'thick'
end at the bottom!
Overgangslykke skal vende med den
"tykke" ende nederst!
LODRET BALANCERET AFTRÆK (SYSTEM L1, L2 og L5)
Hvor forholdene taler herfor anvendes LODRET balanceret aftræk-
hvorved forstås at luften tages ind og røggas ledes ud samme sted LODRET
over tag.
Aftrækssystemets max. længde er 7,5 m. (minus 0,5 m pr 45 ° bøjning,
minus 1 m pr 90 ° bøjning)
LODRET Tilslutningssæt består af:
1 stk. Tilslutningssæt Ø60/100 - Ø80/125
Desuden skal bruges:
1 stk. loftskrave for afslutning mod loft.
1 stk. taggennemføring m. hætte
Et antal dobbeltrør L=1000 eller L=500
1 stk. Taginddækning 5-25 ° eller 25-45 °
evt.
1 sæt knærør (2 stk.) -
2 stk knærør
(evt. "topstykke for skorsten" som inddækning for fladt tag = 091631)
Luftindtag/røgafgang - LODRET
Roof duct with cover
Taggennemføring m/hætte
Roof flashing (5-25°) (25-45°)
Taginddækning (5-25 ° ) (25-45 ° )
45° elbow piece (set of 2)
45 ° knærør (sæt med 2 stk)
Ceiling flange
Loftskrave
Double pipe L = 1000 (L = 500)
Dobbeltrør L = 1000 (L = 500)
Vertical connecting set
Lodret tilslutningssæt
14
921.968.2.00.02.010702
9. Rørene samles og presses ind i
bøjningen.
Tilse at røret med gril er drejet så
det ser pænt ud.
10. Tæt hullet omkring røret på den
indvendige væg.
11. Anbring murplader over røret
udvendig (Hvis hullet passer nøjagtigt
er det unødvendigt at anvende
murplade)
12. Mærk hullerne op
13. Fjern pladen, bor huller, sæt
rawlplugs i (beskyt enden af røret mod
snavs fra boringen).
14. Fjern afdækning der blev anbragt
for at hindre snavs. Anbring murplade
og skru den fast.
Lodret forskydning System V3
1. Hvis der ønskes en lodret
forskydning så indskydes denne
mellem bøjning og kedel
2. Afkortning af inderrør til "lodret
forskydning" skal ske i ende modsat
„spids".
3. I
sættet
medleveres
overgangsstykker – der skal kun bruges
det uden popnitter.
45 ° til system L1 eller
90 ° til system L5
Tilslutningssæt for lodret aftræk
placeres på kedlens røgafgang.
Hullet igennem loft og tag
laves (beskyt kedlen mod
tilsnavsning).
Rørlængde opmåles og
afkortes.
Hvis det er nødvendigt at
parallelforskyde det lodret
balancerede aftrækssystem gøres
dette ved at indskyde 2 stk. 45 °
knærør som vist. (Evt. 2 stk. 90 °
bøjninger).
Mellem knærørene skal
evt. indskydes et rørstykke for at
opnå tilstrækkelig forskydning
Rør monteres gennem tag
og loft.
NB. Husk loftkrave.
Monter taginddækning
Bemærk:
Den sorte kant på
"Taggennemføring m. hætte"
skal gå imod "vippekraven" på
taginddækningen
Rør
fastgøres
tagkonstruktion.
Taginddækning fuges med
silikone.
2
til

Advertisement

Table of Contents
loading

Table of Contents