Mitsubishi 6M70 Workshop Manual page 362

Table of Contents

Advertisement

EGR VALVE, EGR MAGNETIC VALVE, EGR PIPE AND EGR COOLER
Inspection procedures
17-28
Inspection: EGR valve lift
• While applying specified air pressure to the ports in accordance
with the table below, measure the valve lift in operating steps 1
to 8 on each valve.
• Replace the EGR valve if it does not conform to the standard
value.
Operating step
1
2
3
4
5
6
7
8
O: Air applied
–: Air not applied
Inspection: EGR cooler
(1) Exhaust gas passage side
• Fit a cover over the exhaust gas outlet of the EGR cooler, and
connect a hose to the exhaust gas inlet. Then, submerge the
EGR cooler in a container of water. Make sure the coolant pas-
sage is full of water.
• Apply specified air pressure through the hose. Check that air
does not leak from any part.
• If there is any leakage, replace the EGR cooler.
(2) Coolant passage side
• Fit covers over the EGR cooler's exhaust gas inlet, exhaust gas
outlet, and coolant outlet, and connect a hose to the coolant in-
let. Then, submerge the EGR cooler in a container of water.
• Apply specified air pressure through the hose. Check that air
does not leak from any part.
• If there is any leakage, replace the EGR cooler.
Input port
M/V-1
M/V-2
M/V-3
O
O
O
O
O
O
O
O
O
O
O
O

Advertisement

Table of Contents
loading

Table of Contents