Surge Tank Disassembly And Assembly - Mitsubishi 6M70 Workshop Manual

Table of Contents

Advertisement

SURGE TANK
Service standards (Unit: mm)
Location
6
Pressure valve opening pressure
Tightening torque (Unit: N·m {kgf·m})
Mark
Clamp
Water level sensor
Inspection procedure
14-24
Maintenance item
Parts to be tightened
(1) Pressure valve opening pressure
• If the measurement deviates from the standard value, replace
Follow the disassembly sequence in re-
verse.
Standard value
49 ± 9.8 kPa
{0.5 ± 0.1 kgf/cm
Tightening torque
3 to 5 {0.3 to 0.5}
3 to 4 {0.3 to 0.4}
Inspection: Pressure cap
the pressure cap.
Disassembly sequence
1 Supply hose
2 Air bleeder hose
3 Overflow hose
4 Supply pipe
5 Supply hose
6 Pressure cap
7 Water level sensor
8 O-ring
9 Surge tank
: Non-reusable parts
Assembly sequence
Limit
2
)
Remedy
Replace
Remarks

Advertisement

Table of Contents
loading

Table of Contents