Handling
If necessary, adjust the pre-mounted feet from 75 mm to 50 mm:
Pull the foot out and turn by 90°.
5 0 m m
7 5 m m
Attach urinal element to the floor using the fork spanner (size 13)
and the screws and dowels supplied.
13
Determine construction height in accordance with the on-site
marking of the upper edge of the finished floor.
Pull urinal element up (cutting check) and align.
x = Observe the instructions of the urinal manufacturer.
INFO! The construction height must be determined and
x
adhered to exactly.
m
1 , 0
x
There are only limited possibilities available to remedy errors
0
x
m
Ä „Construction height"
made during this assembly step,
0 m
x
0 - 2 0
on page 9 .
Screw the urinal element together laterally with the support profiles.
4x
4x
Viega Eco Plus urinal element siphon sensor technology
14 from 16