560638_B2
m
x
1 , 0
x
x
x
17
0
m
0 m
0 - 2 0
Viega Eco Plus urinal element siphon sensor technology
Drill holes.
Mount the fixing set with the fork spanner (size 13).
13
Align the height of the urinal element in accordance with the cutting
check.
Determine construction height in accordance with the on-site
marking of the upper edge of the finished floor.
x = Observe the instructions of the urinal manufacturer.
x
INFO! The construction height must be determined and
adhered to exactly.
There are only limited possibilities available to remedy errors
0
m m
made during this assembly step,
0 - 2 0 0
on page 9 .
Set the installation depth of the pre-wall element with the fork
spanner (size 17).
17
Attach urinal element to the floor using the fork spanner (size 13)
and the screws and dowels supplied.
13
Ä „Construction height"
11 from 16
Handling