Commissioning and configuration
Attention!
Only then may the supply voltage be applied.
Upon startup of the MA 204i, the device selection switch and the address settings are
queried and the gateway automatically sets itself to the Leuze device.
PWR IN
SWIO_2
2
GND
3
5
4
FE
SWIO_1
M 12 connector
(A-coded)
Figure 12.2: Connections of the MA 204 seen from below, device on mounting plate
 Check the applied voltage. It must be in the range between +18V ... 30 V DC.
Connecting functional earth FE
 Ensure that the functional earth (FE) is connected correctly.
Unimpaired operation is only guaranteed when the functional earth is connected properly.
All electrical disturbances (EMC couplings) are discharged via the functional earth connec-
tion.
On delivery, the SWIO 1/2 are connected in parallel on PWR IN/OUT. This connection can
be separated with a jumper.
12.2

Starting the device

 Apply the supply voltage +18 ... 30 V DC (+24 V DC model); the MA
12.3

Configuration steps for a Siemens Simatic S7 control

The following steps are necessary for commissioning with a Siemens S7 control:
1.
Preparation of the control system (S7 PLC)
2.
Installation of the GSD file
3.
Hardware configuration of the S7 PLC
4.
Configuration of the modules
5.
Transmission of the PROFIBUS configuration to the controller (S7 PLC)
60
PWR OUT
SWIO_2
2
VIN
1
VOUT 1
3
5
4
SWIO_1
M 12 socket
(A-coded)
LEUZE Device
GND
FE
MA
204i
HOST / BUS IN
A (N)
2
GND
N.C.
3
1
VP 1
485
5
4
FE
B (P)
M 12 connector
(B-coded)
204i
starts up.
Leuze electronic
BUS OUT
A (N)
2
GND
3
5
485
4
FE
B (P)
M 12 socket
(B-coded)

Advertisement

Table of Contents
loading

Table of Contents