2.2

Installation procedures

This section details the installation procedures of the system, its components, and connections between
equipment. The installation procedures in this section are in order, so it is strongly recommended
that you follow the said order to reduce the time consumed during installation and prevent installation
mistakes, technical mishaps, or physical injuries.
2.2.1

Unpacking the system

When your system package has arrived, check and confirm if the contents of your package are complete
by referring to the Unpacking List document, which is bundled with in your package.
Accessory box contents
This box contains the following:
DB9 to USB cable
Screws
Compliance and technical documentations
Support CD (EonOne Management software and manual, firmware operation manual)
Product utility CD (Hardware manual)
Pre-installed components
Below are the components that are pre-installed in the system:
LED front panels
DIMM modules
M.2 flash module
Host board/s
Hard drive trays
Components that need user installation upon unpacking
You must do the following installation:
Assembling the hard drives to the hard drive tray
Cabling in between systems
2.2.2

Preparing the installation

Before you start the system installation, you must prepare the following:
1 Small-sized flat blade screwdriver
2.5-inch or 3.5-inch hard disk drives (supports up to 3 TB each drive)
2-2
Chapter 2: Hardware installation

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eonstor gse pro 205Eonstor gse pro 200 series

Table of Contents