3.2.5
Connecting the inlet
Multiplex Trio drain/overflow functional unit
Requirements:
The overflow and drain units are installed on the bathtub.
n
The connection between overflow and drain has been made.
n
If the wastewater pipe only has a diameter of 40 mm, cut off drain
elbow.
Push union nut, sliding ring and seal onto the drain elbow.
Screw the union nut on the drain unit.
Align the odour trap in such a way that the drain elbow can be con-
nected to the wastewater pipe.
Turn the drain at the joints until the required position has been
reached.
Push wastewater pipe in the drain elbow.
Proceed as follows to connect the water inlet to the overflow unit:
Requirements:
n
A connection set (e. g. the pipe interrupter set) is available.
A pipe interrupter is installed in the supply pipeline.
n
Overflow and drain are mounted.
n
Handling
16 from 20