Starting Up; Connection To The Supply; Switching On - Lauda Ecoline Series Operating Instructions Manual

Immersion/bath/circulation thermostats
Table of Contents

Advertisement

Starting up

6
Starting up
6.1

Connection to the supply

Compare the supply voltage against the data on the rating label.
Model according to EMC directive EN 61326-1 Class B.*
− Connect the unit only to a grounded mains power socket (PE).
− No warranty when the thermostat is connected to a wrong supply!
− Without external circuit ensure that the pump pressure outflow is closed or linked to the
− Ensure that the unit is filled in accordance with Section 5.2.!
6.2

Switching on

! ! ! !
! ! ! !
14
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
pump return.
0,25s
− If necessary add more bath liquid to replace the amount pumped out to the external
consumer.
− If the pump does not purge the system immediately. The unit may switch off again
although it is filled sufficiently (only when starting up for the first time)..
(* Notic only valid for EU countries)
− Using a screwdriver set the overtemperature switch-off point
to a value clearly above ambient temperature.
− Switch on at the mains switch.
The green LED for "Supply ON" lights up.
− A tone sounds for approx. 0,25 s.
− The unit self-test starts up. All display segments and
symbols light up for approx. 1 s. Then the software version
is indicated for approx. 1 s.
− Display shows the actual bath temperature. The pump
starts up. The values which were active before switching off
are entered.
− A double signal tone sounds.
* Notice only valid for EU countries!

Advertisement

Table of Contents
loading

Table of Contents