Huawei SUN2000-30KTL-US User Manual page 60

Hide thumbs Also See for SUN2000-30KTL-US:
Table of Contents

Advertisement

SUN2000-(25KTL, 30KTL)-US
User Manual
Figure 5-6 Crimping a cable
Step 2 Connect the prepared cable to the ground point, and tighten the screw using a torque
screwdriver.
Figure 5-7 Connecting ground cables to ground points 1 and 4 (through a tube)
Issue 09 (2019-06-30)
The cavity formed after the conductor crimp strip is crimped must wrap the core wires completely. The
core wires must contact the terminal closely.
When connecting ground cables to ground points 1 and 4, route the cables through the GND and AC
OUTPUT cable glands at the bottom. If cables are routed through a tube, you can secure the tube
after connecting the ground cable to ground point 4 and connecting the AC output power cable.
When connecting the PE cable to the ground point 4, if the SUN2000 is insecurely installed and the
AC output power cable bears the pulling force, ensure that the last cable bearing the force is the PE
cable.
Copyright © Huawei Technologies Co., Ltd.
5 Electrical Connections
53

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sun2000-25ktl-us

Table of Contents