Installation Checklist - Seeley Breezair EXH Series Installation And Operating Instructions Manual

Evaporative air cooler
Table of Contents

Advertisement

Owners Name:
[] Cooler l evel a ndsecure.
Telephone:
Address:
Dealer:
Installer:
DateInstalled:
Model N o.:
Serial N o.:
Motor Type:
MotorPower:
REMOTE
CONTROL
DIP
SWITCHES
Record the dip switch settings for this
cooler below (if applicable)
WARNING:
Do not alter
DIP
switches
1 to 8 on top row and 7
& 8 on bottom
row as the cooler
will cease
to work.
ON
t
OFF
ON
t
OFF
1
2345678
1
2345678
EXAMPLE
ONLY
ILL217-H
Definition of DIP switch positions (first 6
in bottom row only) are as follows:
(1)
Reserved for later use.
(2) [] OFF, 24 hour clock.
[] ON, 12 hour clock.
(3)
Not Used
(4) [] OFF, no pre-cool.
L_J ON, pre-cool.
(5) [] OFF, drains 3 days after power
off.
[] ON, drains 3 hours after power
off.
(6) [] OFF, drains every 65 minutes
of operation.
[] ON, activates water salinity
circuit (WaterManager).
[] All roof work properly sealed.
[] Ductwork and air distribution checked and outlets correctly set.
[] All wiring complete.
[] Control switch correctly installed.
[] Motorand pump correctly plugged into sockets.
[] Drain/overflow fitting correctly installed.
[] Water level and float adjustment checked.
[] Pump runs and water evenly distributed to all cooling pads.
[] All control functions checked.
[]
Owner instructed on correct operating procedure and supplied with
operating instructions.
Signed by Installer: .........................................................
Dated: ........................................................................
SERVICE ENQUIRIES:
Contact your local Dealer or Installer
for assistance.

Advertisement

Table of Contents
loading

Table of Contents