lehman Trikes TRAMP 2009 Service Information page 16

Powered by suzuki
Table of Contents

Advertisement

Jump to Flat Rate Times
R & R DIFFERENTIAL CONTINUED
8. Ensure adequate clearance between drive
shaft and tunnel in swingarm.
9. See Fig. 8. Install (2) u-bolts, (4) lock washers
and (4) nuts to install yoke to pinion shaft.
10. Tighten bolts using 1/2" wrench. Be sure to
tighten both sides equally from both side to
side and top to bottom.
11. Torque u-bolts to 20 ft-lbs.
CAUTION: Do not over-tighten u-bolts. The
bearing cups may distort, causing prema-
ture joint failure or u-bolts may break.
12. Remove differential fill plug and apply .9L (30
oz.) of 80w90 gear oil. Replace fill plug.
13. Torque fill plug to 40 ft-lbs.
CAUTION: Do not over-fill differential. Pos-
sible axle seal failure and contamination of
rear brake linings can occur.
14. See Fig. 9. Attach braided brake line from
master cylinder to brass brake "T" with banjo
bolt and two sealed washers.
15. Tighten banjo bolts at brass "T" using 3/8"
wrench.
16. Torque banjo bolt to 16 ft-lbs.
17. Tighten all brake line fittings to banjo bolts and
brake drums.
Jump to Parts and Pricing
16
Fig. 8
Install u-bolts
Fig. 9
Attach brake line

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for lehman Trikes TRAMP 2009

Table of Contents