Assembly Procedure - ATTACK FD20 Instructions For Use Manual

Fd solid fire
Hide thumbs Also See for FD20:
Table of Contents

Advertisement

Unpack parts of convertible kit. Check if the composition agree with the size of the boiler. Check
if the concrete parts are not damaged.

19.1 ASSEMBLY PROCEDURE

Assembly the cover sheet with screws M6x10 – 2 pcs on rear side of boiler. Then assembly flue
gas chimney. The flue gas chimney is universal.
Insert concrete parts „A", „B", „C", „D" according to this description. The composition depend on
the size of boiler. Insert 2 pieces of the part „F" to the upper part.
Insert the part „G" into the boilers FS5DA, FS6DA, FS7DA. This part is universal.
Insert the part „H" into the boiler. Hang it up on juts in upper part of cast iron.
This part is universal.
26

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fd26Fd32Fd36Fd42

Table of Contents