Adjust Lead Rail Alignment (If Required); Verify Installation; Test Operation; Secure Awning For Travel - Dometic 9500 200 003 Series Installation Instructions Manual

Manual case / cassette awning
Table of Contents

Advertisement

ADJUSTMENTS (OPTIONAL)
7. Tighten both pivot clamp screws to 140 in·lb
torque (to clamp front shoulder collet to shoul-
der pivot).
 R epeat this step for each lateral arm as-
sembly.
8. Verify awning will close without interference.
 S ee subsection, "C. Adjust Lead Rail
Alignment (If Required)" on page (10)
to adjust lead rail alignment.
C.

Adjust Lead Rail Alignment (If Required)

After fabric slope and lateral arm assembly adjust-
ments, the lead rail may need realignment with top
and end caps. See (FIG. 18).
1.  C heck alignment of lead rail against top and end
caps.
2. Extend awning far enough (approximately 6") to
access adjustment screw in wrist pivot.
3. Tilt lead rail, by turning adjustment screw in wrist
pivot (for each lateral arm assembly), until align-
ment appears correct.
a. Turn clockwise to tilt lead rail forward.
b. Turn counter-clockwise to tilt lead rail back.

VERIFY INSTALLATION

A.

Test Operation

Operate awning according to Operating Instruc-
tions to verify all parts are functioning correctly.
B.

Secure Awning For Travel

1.  F ully close awning. See "Close Awning" in Oper-
ating Instructions.
2. Verify awning is secure for travel. See "Prepare
Awning For Travel" in Operating Instructions.
4. Retract awning again to check alignment of lead
rail against top and end caps.
5. Repeat steps (2) through (4) as necessary.
FIG. 18
Adjustment
Screw
Lead Rail
Wrist Bracket
C.

Keep Literature

Instructions contain valuable information for prod-
uct use and consumer safety.
Keep BOTH the Installation and Operat-
ing Instructions with product.
10
Top
RH End
Cap
Lateral Arm
Wrist Pivot
Assembly

Advertisement

Table of Contents
loading

This manual is also suitable for:

9500 series

Table of Contents