Water And Sewer Facilities At The Installation Site (Water-Cooled Models) - Quincy QGV-100 Instruction Manual

Variable speed drive air compressors
Table of Contents

Advertisement

Section III - Installation
Water and Sewer Facilities at the In-
stallation Site (water-cooled models)
Clean, soft and/or treated water is required
to ensure the efficient, long service life of
the water-cooled heat exchangers.
It is strongly recommended that a
reputable, local water treatment company
be engaged prior to start-up to establish
the corrosion, scale forming and fouling
tendency of the cooling water and remedy
the situation if a problem exists.
notiCe!
Failure to develop a water treatment
p l a n m a y r e s u l t i n i n c r e a s e d
maintenance and operating expense,
reduced equipment life and emergency
shutdown.
6
Make sure the water supply is connected
and open. Piping supplied by the user
should be at least equal to the connections
provided on the compressor. Sewer
facilities should be readily accessible
to the installation site and meet all the
requirements of local sewer codes, plus
those of the compressor. Make sure
water inlet and discharge connections are
correct.
A water temperature regulating valve is
located in the discharge water line.
Quincy Compressor-QGV Series
notiCe!

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Qgv-75Qgv seriesQgv-50Qgv-200Qgv-150

Table of Contents