IBM System/370 Manual page 108

Hide thumbs Also See for System/370:
Table of Contents

Advertisement

86
• Train operators to run the System Test and the Processor Logout
Analysis programs.
The conditions under which these programs are
to be run should be determined jointly
by
the user and the customer
engineer.
• Plan system and program recovery procedures (use of warm start
and checkpoint/restart facilities)
• Have operating personnel perform normal hardware maintenance
procedures. such as the periodic cleaning of tape drive heads.
Proper system hygiene should be maintained. in general.
• Implement an effective program of operator training so that the
number of system malfunctions that occur because of operator error
is reduced.

Advertisement

Table of Contents
loading

This manual is also suitable for:

165

Table of Contents