Keypad Segment Test - Bosch B9512G Installation Manual

Hide thumbs Also See for B9512G:
Table of Contents

Advertisement

26
en | ULC Installation Guide
Configure OUTPUT A to AUX PWR using the jumper.
Wire a 12 VDC (100 mA maximum) sounder to OUTPUT A.
Figure 1.16: B6512/B5512/B4512/B3512 control panel sounder wiring
and hardware configuration
1.4

Keypad segment test

You can test B915/B915I and B920 keypads to ensure that the
LEDs and display are working.
To test a keypad, simultaneously press and hold the [NEXT]/[▼]
and [3] keys for 3 seconds. The segment test lights the LEDs
and the display.
NOTE: During the segment test, the B915/B915I reports a
missing trouble.
1.5
Programming
Complete the programming steps in this section for ULC
compliance.
2019.06 | 02 | F.01U.321.698
OUTPUT A
Jumper Under Cover
AUX PWR
COM
DRY
OUTPUT A
18 VAC
BATTERY
OUTPUT A
NO C NC
18VAC
+ BAT -
OUTPUT A
P1
COM AUX
Y
X
COMMUNICATION MODULE 1
P1
COM AUX
SDI2
Device Bus
R Y G B
AUX
1 COM 2
- 12 V +
COM AUX
R
Y
G
B
1
COM
PWR A
B COM
Control Panels
MODULE 1
100BASE-T
LINK
USB
ON-BOARD POINTS
Voltage Ranges
C
Open
3.7 - 5.0 VDC
OUTPUT
Normal
2.0 - 3.0 VDC
B
Short
0.0 - 1.3 VDC
1 k
End of Line Resistors
3 COM 4 5 COM 6
7 COM 8
2
3
COM
4
5
COM
6
7
COM
Sounder
Bosch Security Systems B.V.
MODULE
RELEASE
ETHERNET
8

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents