Step 7: Setting The Elevation And Tightening The Elevation Bolt; Step 8: Earth Grounding The Ap - Ruckus Wireless Q910 User Manual

Lte
Hide thumbs Also See for Q910:
Table of Contents

Advertisement

3.
If required, suspend AP by attaching a carabiner to the hoisting loop on the AP bracket.
NOTE
This kit may include extra screws, nuts, and washers. You may use the extras wherever required.
4.
Continue with

Step 7: Setting the Elevation and Tightening the Elevation Bolt

Step 7: Setting the Elevation and Tightening the Elevation Bolt
1.
Set the elevation required by AP.
2.
Tighten the M8 bolt to13.6 N-m (10 ft-lbs.)
3.
Continue with

Step 8: Earth Grounding the AP

Step 8: Earth Grounding the AP
CAUTION
Make sure that earth grounding is available and that it meets local and national electrical codes. For
additional lightning protection, use lightning rods and lightning arrestors.
NOTE
The color coding of ground wires varies by region. Before completing this step, check your local wiring standards for guidance.
Using the factory-supplied ground wire and ground screw/ washer set, connect a good earth ground to the AP chassis ground point.
CAUTION
Q910 AP includes one 12 mm stainless steel M6x1 earth ground screw with split lock and flat washers.
Make sure that any replacement screw is no longer than 12 mm. If a screw is longer than 12 mm, it can
damage the AP chassis.
FIGURE 10 Connect good earth ground to AP here
Q910-US00 User Guide
Part Number: P01-Q910-US00
on page 17.
Physical Installation of Q910 LTE Access
Point
on page 17.
Mounting Instructions
21

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Q710

Table of Contents