Mounting The Basic Unit - Viega 1247.4 Instructions For Use Manual

Basic unit 24 v with pump module
Table of Contents

Advertisement

3.3.2

Mounting the basic unit

Basic unit 24 V
with pump module
Mounting preparation
The manifold and actuators have been mounted.
n
The power supply for the basic unit has been prepared.
n
n
The room thermostats have been mounted and connected.
Required tools and materials:
Power drill
n
Ø 6 mm masonry drill, or Ø 3 mm metal drill for mounting the basic
n
unit to the rear of the manifold cabinet.
Screwdriver
n
n
Two dowels 6 x 30 and screws for wall mounting are comprised in
the scope of delivery.
Cables in sufficient length for connecting the room thermostats
n
NOTICE!
The installation site must be in direct vicinity of the mani-
fold.
Make bore holes spaced at 310 mm.
Use the supplied screws and dowels to mount the basic unit to the
wall.
Handling
11 from 17

Advertisement

Table of Contents
loading

Table of Contents