Verifying The Connection - SolarEdge EV Series Installation Manual

Charging single phase inverter with setapp configuration
Table of Contents

Advertisement

68
  Verifying the Connection
Server è LAN, Cellular or Wi-Fi
RS485-2 è Protocol è SolarEdge èSolarEdge Master
RS485-2 è Slave Detect
The system starts automatic detection of the slave inverters connected to the master
inverter. The inverter should report the correct number of slaves. If it does not, verify
the connections and terminations.
 6. To check the slave IDs and last communication time, select RS4852 è Slave List.
 7. Verify the connection of the master to the monitoring platform, as described in the
next section.

Verifying the Connection

After connecting and configuring a communication option, perform the following
steps to check that the connection to the monitoring server has been successfully
established.
 1. Access the Status screen:
 a. If not already ON - turn ON AC to the inverter by turning ON the circuit breaker
on the main distribution panel.
 b. Open SetApp and follow the instructions on the screen (scan the inverter bar-
code; move the ON/OFF/P switch to P position (for less than 5 sec) and release).
The mobile device creates a Wi-Fi connection with the inverter and displays the
main Commissioning screen.
EV Charging Single Phase Inverter Guide MAN-01-00588-1.1