SolarEdge EV Series Installation Manual page 50

Charging single phase inverter with setapp configuration
Table of Contents

Advertisement

Main Inverter Status
Power
7.6 kW
   P_OK: 15 of 30
Optimizers
Connected
Status
Production
CosPhi
1.00
Voltage
380 Vdc
Switch Off. Production
Commissioning
Inverter: The inverter serial number
Power: The AC output power
Voltage (Vac): The AC output voltage
Frequency: The AC output frequency
P_OK: xxx of yyy: There is a connection to the power optimizers and at least one
power optimizer is sending monitoring data. XXX is the number of power optimizers
for which telemetries have been received in the last two hours. YYY is the number
of paired power optimizers identified during the most recent pairing process. If XXX
and YYY are not equal, there may be a problem in one or more power optimizers.
S_OK: The connection to the monitoring platform. (Server Connected appears only
if the inverter is connected to the monitoring platform).
EV Charging Single Phase Inverter Guide MAN-01-00588-1.1
Chapter 4: Activating, Commissioning and Configuring the System
Status
Inverter
SN 07318000C
Voltage
Frequency
240Vac
60 Hz
Server Comm.
S_OK
(LAN)
 Switch
OFF
Limit
Country
No Limit
USA2
Temp
Fan
156 F
OK
disabled 
        ›
    49

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Se3800h-usSe5000h-usSe7600h-usSe6000h-usSe11400h-us

Table of Contents