SolarEdge EV Series Installation Manual page 52

Charging single phase inverter with setapp configuration
Table of Contents

Advertisement

Site Status
The Site status screen shows the accumulated status of all inverters connected to a
master inverter in a chain (bus) and the master inverter status.
Production
90 kW
Power
100 kW
P_OK: 31 0f 31
Optimizers Connected
Status
Production
CosPhi
1.00
Switch Off. Production disabled
Commissioning
Site status:
Production: The AC output power
Limit: Limitation setting (Export or Production)
Inverters: Number of connected inverters in the cluster, including the master
 
EV Charging Single Phase Inverter Guide MAN-01-00588-1.1
Chapter 4: Activating, Commissioning and Configuring the System
Status
Site
Limit
Inverters
1.00 MW
10/10
Inverter
SN 07318000C
Voltage
Frequency
277 Vac
60.9 Hz
S_OK
Server Connected
Switch
OFF
Limit
Country
Export
USA2
       ›
    51