INTRODUCTION Welcome HEATED CABINETS INTRODUCTION Future Welcome to the world of FPG! Our products are designed and engineered to Products give you the optimal performance that you deserve with innovative visual Group (FPG) merchandising appeal. We are confident that you will be delighted with your state of the art inline food service cabinet, and that it will become a valued appliance in your store.
Fair wear and tear. Assessment The liability under this warranty is dependent on an assessment by FPG, to determine the defect in workmanship or materials. Time Limit FPG does not guarantee that any service to be performed under this warranty will be carried out within any particular time limit.
OPERATION Cabinet Layout HEATED CABINETS OPERATION Tilt or Sliding The tilt door cabinet has a single front door and two Front Doors sliding rear doors. The front door is hinged along the bottom edge, and is opened by pulling the top edge forward. When opened, the door is restrained from falling by wire cables, which retract into “pull...
Controls HEATED CABINETS OPERATION Control Panel The control panel is mounted on the back of the cabinet, and houses: The main power switch The Light switch The cabinet temperature controller Power Switch To turn the power on, rotate the mains switch in a clockwise direction.
Preparation HEATED CABINETS OPERATION Shelf Location All shelves are adjustable in height and can easily be and Ticketing moved up or down, to match product size. The movement is restricted to 50mm, because of the electric cables to the lights. For greater movement contact the manufacturer or supplier for advice, as electrical modifications may be required.
Preparation cont. HEATED CABINETS - OPERATION Set the Set the controller to the desired temperature, 80°C Temperature is the recommended setting to maintain food temperature within food safety guidelines. The temperature can be changed by holding down the left button, and pressing the up or down key as required.
TROUBLE SHOOTING FAULT POSSIBLE CAUSE REMEDY Door not in track Install door correctly in track Debris in track Clean door tracks (see cleaning) Doors are not sliding smoothly Door glider damaged/missing Have glider replaced Apply food grade lubricant to Lack of lubricant door track The mains isolating switch on the wall, circuit breaker or...
CLEANING Cautions HEATED CABINETS CLEANING Power ALWAYS TURN THE POWER SUPPLY OFF BEFORE CLEANING. Water THIS UNIT IS NOT WATERPROOF. DO NOT USE A WATER JET SPRAY TO CLEAN THE INTERIOR OR EXTERIOR OF THIS CABINET. Exterior HEATED CABINETS CLEANING Painted and Painted, stainless steel or aluminium surfaces should be cleaned with hot soapy Metal Surfaces...
Interior HEATED CABINETS CLEANING Cabinet Well To clean the hot cabinet well, first lift out the deck trays and dividers and then sweep out or vacuum loose debris. Finally, wipe out the well with a damp cloth. This cabinet is a dry well unit, so the well is not waterproof.
Routine HEATED CABINETS CLEANING Schedules To maintain optimum performance, cleaning schedules must be regular and thorough. Inspection As part of the cleaning routine, the controls, mechanical parts and electrical wiring should be inspected for damage, deterioration or need of adjustment. Correction If any small faults are found, have them attended to promptly by a competent serviceman.
INSTALLATION Regulations HEATED CABINETS INSTALLATION Compliance It is very important that your inline food cabinet is installed correctly and that the with Local operation is correct before use. Installation must comply with local electrical, Requirements health & safety and hygiene requirements. Setting Up HEATED CABINETS INSTALLATION...
Location HEATED CABINETS INSTALLATION Ventilation The vent located on the rear of the cabinet must never be obstructed. If obstructed the cabinet may overheat and cause an electrical malfunction. Before use, operate the cabinet for 1-2 hours to remove any fumes or odours, which may be present.
SERVICING Lighting HEATED CABINETS SERVICING Caution DO NOT service lights without isolating the cabinet at the main switch or unplugging it from the wall. Control Gear The control gear, including the LED lighting power Chassis supplies, is located behind the left hand rear panel. All low power circuits are protected by a circuit breaker, MCB, which can be operated via a cut-out in the top of the chassis.
Heating HEATED CABINETS SERVICING Caution DO NOT attempt to replace heating elements without isolating the cabinet at the main switch or unplugging it from the wall. Element Remove all base trays and dividers Remove the Replacement from the back panel inside of and/or control the cabinet,...
Mains Lead HEATED CABINETS SERVICING Lead If damaged, the mains lead must ONLY be replaced by a qualified service Replacement person. Gaskets HEATED CABINETS SERVICING Qlon Gaskets On tilt front cabinets, the front door aperture is fitted with a Qlon gasket along the top.
SPECIFICATIONS Mechanical HEATED CABINETS SPECIFICATIONS CABINET MODEL IN 5H08 IN 5H12 IN 5H15 IN 5H18 Height (150mm Feet) 1443 mm 1443 mm 1443 mm 1443 mm Height (100mm Feet) 1393 mm 1393 mm 1393 mm 1393 mm Width 807 mm 1207 mm 1507 mm 1807 mm...
>65°C 23°C Ambient with 65% RH Improvements HEATED CABINETS SPECIFICATIONS Ongoing FPG reserves the right to change specifications and construction, as part of Development ongoing product improvement. Part No. 26108 Rev. C December 2015 - 22 - 5000 Series Cabinets...
ELECTRICAL CIRCUIT DIAGRAMS, Continued Model: IN 5H15 Inline 5000 Series, 1500mm Heated Cabinet Model: IN 5H18 Inline 5000 Series, 1800mm Heated Cabinet Part No. 26108 Rev. C December 2015 - 24 - 5000 Series Cabinets...
Number the label fixed to the control panel. This serial number will enable FPG to trace details of the build specification of your particular cabinet, and hence ensure that spare parts are fully compatible. To satisfy warranty conditions, and ensure optimum performance, use only FPG supplied spare parts.
In the following table, handed glass parts are labelled as viewed from the REAR Glass Parts of the cabinet. Part Description FPG Part Number End Glass LH (Except for Square Glass Cabinets) 21191 End Glass RH (Except for Square Glass Cabinets)
MECHANICAL DRAWINGS Cabinet Feet These drawings show cabinets fitted with the standard 150mm tapered feet. Alternative 100mm cylindrical feet are available for special orders. These will reduce the overall cabinet height, and also have only -0 +25mm of adjustment. Tilt Door Cabinets Types IN 5H08/12/15 IN 5H08/12/15/18...
Need help?
Do you have a question about the INLINE 5000C Series and is the answer not in the manual?
Questions and answers