FPG IN 3H06 Product Manual

Heated cabinets, curved format
Table of Contents

Advertisement

Quick Links

Heated Cabinets
Curved Format

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the IN 3H06 and is the answer not in the manual?

Questions and answers

Summary of Contents for FPG IN 3H06

  • Page 1 Heated Cabinets Curved Format...
  • Page 2 Copyright © September 2018 Future Products Group Limited. All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, without the prior written permission of Future Products Group Ltd.
  • Page 3: Table Of Contents

    Table of Contents INTRODUCTION ........................ 6 Welcome ................................6 Future Products Group (FPG) ........................6 Guidance and Help ............................ 6 Warranty ................................6 Warranty Period ............................6 Liability Exceptions ............................ 7 Specific Exclusions ............................ 7 Assessment ............................... 7 Time Limit ..............................7 Caution ..............................
  • Page 4 Routines ................................ 13 Schedules..............................13 Inspection ..............................13 Correction ..............................13 INSTALLATION ....................... 14 Regulations ..............................14 Compliance with Local Requirements ..................... 14 Setting Up ..............................14 Unpacking ............................... 14 Site Preparation............................14 Cabinet Preparation ..........................14 Shelf Trays .............................. 14 Grounding..............................
  • Page 5 Performance Aspects ..........................21 Improvements ............................... 21 Ongoing Development ..........................21 ELECTRICAL CIRCUIT DIAGRAMS ................22 Model: IN 3H06 ............................22 Model: IN 3H08 ............................22 Model: IN 3H12 ............................23 Model: IN 3H15 ............................23 SPARE PARTS ........................ 24 Cabinet Serial Number ..........................
  • Page 6: Introduction

    INTRODUCTION Welcome HEATED CABINETS INTRODUCTION Future Welcome to the world of FPG! Our products are designed and engineered to Products give you the optimal performance that you deserve with innovative visual Group (FPG) merchandising appeal. We are confident that you will be delighted with your state of the art inline food service cabinet, and that it will become a valued appliance in your store.
  • Page 7: Liability Exceptions

    • Fair wear and tear. Assessment The liability under this warranty is dependent on an assessment by FPG, to determine the defect in workmanship or materials. Time Limit FPG does not guarantee that any service to be performed under this warranty will be carried out within any particular time limit.
  • Page 8: Operation

    OPERATION Cabinet Layout HEATED CABINETS OPERATION 3000 Series The 3000 Series cabinets are available with Cabinets either fixed glass or sliding glass front doors, and sliding glass rear doors, (hinged on 600). The series includes Ambient, Heated and Refrigerated models. The cabinet lighting and temperature controls are on the back of the cabinet.
  • Page 9: Preparation

    Fumes and Before use, operate the cabinet for 4 hours to remove any fumes or odours, Odours which may be present. This will avoid possible tainting of food. Continued on next page IN 3H06/08/12/15 - 9 - © Future Products Group...
  • Page 10: Load Cabinet

    Preparation cont. HEATED CABINETS - OPERATION Load Cabinet Load the cabinet with pre-heated product. The cabinet is designed to maintain the temperature of pre-heated product above 65C. It is not an oven, and consequently, if cold product is introduced, there could be a considerable delay before the operating temperature rises to the normal operating level.
  • Page 11: Trouble Shooting

    (5A Slow Blow) Aluminium parts corroded Caustic detergent damage Order replacement parts Service The table entries in italics indicate actions to be taken only by qualified Service Personnel Only Personnel. IN 3H06/08/12/15 - 11 - © Future Products Group...
  • Page 12: Cleaning

    CLEANING A wall chart is included at the back of this manual. It contains step-by-step instructions for every day cleaning of your cabinet. However, please read the following additional information. Cautions HEATED CABINETS CLEANING Power ALWAYS TURN THE POWER SUPPLY OFF BEFORE CLEANING. Water THIS UNIT IS NOT WATERPROOF.
  • Page 13: Interior

    Correction If any small faults are found, have them attended to promptly by a competent serviceman. Don’t wait until they cause a complete breakdown. IN 3H06/08/12/15 - 13 - © Future Products Group...
  • Page 14: Installation

    INSTALLATION Regulations HEATED CABINETS INSTALLATION Compliance It is very important that your inline food cabinet is installed correctly and that the with Local operation is correct before use. Installation must comply with local electrical, Requirements health & safety and hygiene requirements. Setting Up HEATED CABINETS INSTALLATION...
  • Page 15: Grounding

    Before use, operate the cabinet for 4 hours at 90°C, to remove any fumes or Odours odours, which may be present. Open the doors periodically during this period, to allow a change of air. This will avoid possible tainting of food. IN 3H06/08/12/15 - 15 - © Future Products Group...
  • Page 16: Livery

    Livery HEATED CABINETS INSTALLATION Custom Inserts The captive strips, above and below the front doors, can be removed and replaced with coloured or printed strips of decorative laminate, if desired. The cabinet top must be unscrewed, to allow the upper strip to be changed. The lower strip is held captive by the...
  • Page 17: Servicing

    A complete light unit must be used. Connection is made with a plug and socket. Disconnect the supply lead from the faulty unit, and reconnect it to the replacement unit. IN 3H06/08/12/15 - 17 - © Future Products Group...
  • Page 18: Heating

    Heating HEATED CABINETS SERVICING Caution DO NOT attempt to replace heating elements without isolating the cabinet at the supply switch or by unplugging it from the mains supply. Element Remove all base trays and dividers from Replacement inside the cabinet, to reveal the heating elements.
  • Page 19: Door Seals

    Mains Lead HEATED CABINETS SERVICING Lead If damaged, the mains lead must ONLY be replaced by a qualified service Replacement person. IN 3H06/08/12/15 - 19 - © Future Products Group...
  • Page 20: Specifications

    SPECIFICATIONS Mechanical HEATED CABINETS SPECIFICATIONS CABINET MODEL IN 3H06 IN 3H08 IN 3H12 IN 3H15 Height 767 mm 761 mm 761 mm 761 mm Width 593 mm 803 mm 1203 mm 1503 mm Depth 663 mm 663 mm 663 mm...
  • Page 21: Compliance

    Cabinet Operating Temperature Test Conditions >65°C 22°C Ambient with 65% RH Improvements HEATED CABINETS SPECIFICATIONS Ongoing FPG reserves the right to change specifications and construction, as part of Development ongoing product improvement. IN 3H06/08/12/15 - 21 - © Future Products Group...
  • Page 22: Electrical Circuit Diagrams

    ELECTRICAL CIRCUIT DIAGRAMS Model: IN 3H06 Inline 3000 Series, 600mm Heated Cabinet Model: IN 3H08 Inline 3000 Series, 800mm Heated Cabinet Part No.26118 Rev. H September 2018 - 22 - Inline 3000 Series Cabinets...
  • Page 23: Model: In 3H12

    ELECTRICAL WIRING DIAGRAMS, Continued Model: IN 3H12 Inline 3000 Series, 1200mm Heated Cabinet Model: IN 3H15 Inline 3000 Series, 1500mm Heated Cabinet IN 3H06/08/12/15 - 23 - © Future Products Group...
  • Page 24: Spare Parts

    When ordering spare parts, it is important to quote the Serial Number printed on Number the label fixed to the control panel. This will enable FPG to ensure that spare parts are fully compatible with your cabinet. To satisfy warranty conditions, and ensure optimum performance, use only FPG supplied spare parts.
  • Page 25: Handed Parts

    Handed Parts All handed parts are referenced as viewed from the back of the cabinet Part Description FPG Part No. LH End Glass Kit (viewed from back of cabinet) 62709 RH End Glass Kit (viewed from back of cabinet)
  • Page 26: Mechanical Drawings

    MECHANICAL DRAWINGS Dimensions HEATED CABINETS MECHANICAL DRAWINGS IN-3H06-A002 Part No.26118 Rev. H September 2018 - 26 - Inline 3000 Series Cabinets...
  • Page 27: In-3H08/12/15

    Dimensions cont. HEATED CABINETS - MECHANICAL DRAWINGS IN-3H08/12/15 Continued on next page IN 3H06/08/12/15 - 27 - © Future Products Group...
  • Page 28: Cabinet Variants

    Dimensions cont. HEATED CABINETS - MECHANICAL DRAWINGS Cabinet The drawings show the common overall dimensions for 800mm, 1200mm and Variants 1500mm cabinets. The cabinets can have a single fixed front glass, in place of the twin sliding doors shown. Livery Top Insert 539 / 749 / 1149 / 1449 mm long x 50 mm wide Colour / Text...
  • Page 29: Bench Cut-Outs

    The following diagram shows the size and location of the holes, required for the Mounting cabinets to sit on the bench. The holes are always in the same location, with reference to the back, right hand corner of all cabinets. IN 3H06/08/12/15 - 29 - © Future Products Group...
  • Page 30 Part No.26118 Rev. H September 2018 - 30 - Inline 3000 Series Cabinets...
  • Page 31 IN 3H06/08/12/15 - 31 - © Future Products Group...
  • Page 32 Part No.26118 Rev. H September 2018 For full contact details please visit the Contacts page on FPGWORLD.COM or email us at support@fpgworld.com In line with policy to continually develop and improve its products, Future Products Group reserves the right to change specifications and design without notice. AUSTRALIA CHINA | ASIA EUROPE...

Table of Contents