Emerson 810-1600 Installation And Operation Manual page 40

Table of Contents

Advertisement

Figure 4-4 - C3: Serial Tab
4.
Press the
COM4 or COM6).
Press  for LOOK UP and select MODBUS-1, MODBUS-2 or 
5.
MODBUS-3.
6.
Press
7.
Set the MODBUS connection as follows:
Press
>
>
>
>
Press
8.
Press
9.
Press
Device and COM Port Setup in E2Programmable Touchscreen Thermostat Setup for E2 and Site Supervisor •
35
to select the Com Port that the device is wired to (COM2,
to set configuration.
to select options and press e to set the configuration.
Com Baud: 19.2 Kbaud
Com Data Size: 8
Com Parity: None
Com Port Stop Bits: 1
to set the configuration.
to save changes.
to return to the Home screen.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents