Download Print this page

Screen Innovations Nano Roll 275 Series Manual Operation Instructions page 5

Advertisement

INSTALLATION – Nano Roll – Manual Operation
NOTE: Nano manual shade brackets are intended to be wall mounted.
They may be ceiling mounted, but the appearance is degraded.
1. Hold the wall bracket/end cap assembly against the wall and mark the hole locations.
2. Remove the end cap, fasten the bracket with the supplied screws, and replace the end cap.
3. Measure the bracket to bracket width and verify it matches the width as ordered.
Remove the end caps.
Installation - Nano Roll - Manual
NOTE: Make sure to leave
enough space for the end cap.
Brackets must be
level before the
shade is installed!
INSTALLATION – Nano Roll – Manual Operation
4. Insert the idler side, making sure the four small pins are engaged with the bracket.
NOTE: Shade should be oriented with weight
bar approximately at upper limit.
5. Install the spring side with the small rib and arrows facing upwards.
Pg 7
Installation - Nano Roll - Manual
Pg 8

Advertisement

loading