6 Commissioning and adjusting

Filling and venting

Filling the hot water heater
1. Open a hot water tap in the house.
2. Fill the hot water heater through the cold water
connection (XL3).
3. When the water that comes out of the hot water tap
is no longer mixed with air, the water heater is full
and the tap can be closed.
14
Chapter 6 |
Commissioning and adjusting
Filling and venting the charge coil
Filling
1. Open the filling valve (external, not included with the
product). Fill the coil in the hot water heater and the
rest of the climate system with water.
2. Open the venting valve (QM22).
3. When the water that exits the venting valve (QM22)
is not mixed with air, close the valve. After a while
the pressure starts to rise.
4. Close the filling valve when the correct pressure is
obtained.
Venting
1. Vent the coil via the venting valve (QM22) and the
rest of the climate system via the relevant venting
valves.
2. Keep topping up and venting until all air has been
removed and the pressure is correct.