Chain Shielding Installation - Woods 208-2 Operator's Manual

Rotary cutter
Table of Contents

Advertisement

Chain Shielding Installation (Figure 32)
A
WARNING
Full chain shielding, designed to reduce the
possibility of thrown objects, must be installed
when operating in populated areas or other areas
where thrown objects could injure people or dam-
1. Front chain shielding
2. Right rear chain shielding
3. Rear chain shielding
4. Left rear chain shielding
5. 1/2 x 1--1/4" Bolt
6. 1/2" Locknut
7. 1/2" Flange locknut
32394 (Rev. 9/3/2004)
age property. If this machine is not equipped with
full chain shielding, operation must be stopped
when anyone comes within several hundred feet.
Install chain shielding as shown, inserting bolts from
inside out. Be sure to use flange locknuts (7) on front
shields, and locknuts (6) on rear chain shielding. When
assembly is finished, complete the Pre-Delivery and
Delivery checklists on page 40.
Figure 32. Chain Shielding Installation
Assembly 37

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

M208-2

Table of Contents