Airbridge BTS3606E&3606AE
System Commissioning Guide
About This Chapter
The following table lists the contents of this chapter.
Title
3.1 Commissioning Flowchart
3.2 BTS Startup Process
3.3 Starting Local Maintenance
3.5 O&M Test
3.6 RF Performance Test
3.6 Service Function Test
Issue 02 (2006-10-10)
3
Commissioning Process
Description
Describes the BTS commissioning process and
operation tasks in terms of flowchart.
Describes the general procedure for starting the BTS.
Describes the procedure for starting local
maintenance.
Describes the procedure of O&M commissioning.
Describes the procedure of the commissioning of the
RF specifications.
Describes the procedure of service function
commissioning
Huawei Technologies Proprietary
3 Commissioning Process
3-1