Clearance Requirements

• Clearance is required for cables that connect to as many as 768 ports (in addition to the cabling required
Also, you must have power receptacles that are located within reach of the power cords that are used with the
switch.
Warning
Statement 1048—Rack Stabilization
Stability hazard. The rack stabilizing mechanism must be in place, or the rack must be bolted to the floor
before you slide the unit out for servicing. Failure to stabilize the rack can cause the rack to tip over.
Clearance Requirements
Provide the chassis with adequate clearance between the chassis and any other rack, device, or structure so
that you can properly install the chassis. Provide the chassis with adequate clearance to route cables, provide
airflow, and maintain the switch. For the clearances required for an installation of this chassis, see the following
figure.
1
2
Cisco Nexus 9516 NX-OS Mode Switch Hardware Installation Guide
14
for other devices in the same rack). These cables must not block access to any removable chassis modules
or block airflow into or out of the chassis. Route the cables through the cable management frames on the
left and right sides of the chassis.
Chassis
Vertical rack-mount posts
and rails
9
Rear service clearance
required to replace fan
trays and fabric modules.
10
Minimum clearance
required for module
handles (up to 6 inches
[15.24 cm] recommended
for optimal airflow) when
using cabinet doors