Statistics Function; Reviewing An Acceptance Log (Total) - JCM GLOBAL DT-300 Series Operator Integration Manual

Download tool
Table of Contents

Advertisement

press the
Key
OK
["M:" indicates the "Model Name" and "V:" indi-
cates the "Version".]
NOTE: The DT-300 screen can display
up to (20) files using the UP
DOWN
additional storage, but files exceeding
twenty (20) will not display.]
Figure 12 Select the Download File
6.
Press the
Key
OK
download (See Figure 13). Press the
to return to the previous File Selection
Screen.
NOTE: If the connection between the
Validator and the DT-300 fails, or the
Software selected is inappropriate for the
Validator, a Software download will not
begin!
Figure 13 Download Waiting Screen
7.
Ensure that the LCD Display shows the Flash
ROM is in Erase Standby after pressing the
.
Key
Figure 14 Flash ROM Erase Standby Screen
The LCD Screen will display a Progress Bar 
during the Software download (See Figure 15).
NOTE: While downloading Software, NO
Keyboard operations will be accepted!
Figure 15 Software Downloading Screen
Figure 16 Software Download Verifying Screen
8.
After the Software Download is complete
(See Figure 17), the LCD Screen will display the
P/N 960-000167R_Rev. 1 {EDP #214645}
DT-300™ Series Download Tool Operator Integration Guide
to select it (See Figure 12).
or
key. [The SD card may have
to begin the Software
Key
CLR
OK
Download Complete
or the
Key
CLR
Figure 17 Software Download Complete Screen
S
F
TATISTICS
UNCTION

Reviewing an Acceptance Log (Total)

To review the total number Acceptance Log from
the a Validator, proceed as follows:
NOTE: The Acceptance Log File is generated on
the SD Card when it is successfully received
from the Validator. Refer to "Received Log File"
on page 13 of this Guide for details regarding the
Acceptance Log File.
1. Turn the DT-300
Card check will begin (See Figure 18).
2. Select "
STATISTICS
Screen, and then press the
it (See Figure 19).
Figure 18 SD Card Confirmation Screen 2
Figure 19 Function Selection Screen 2
3. Connect the USB Port of the Validator to the DT-
300™ Device using a proper USB Cable
(See Figure 20). Once detected, the connection
between the Validator and the DT-300™ will
automatically begin to receive the Validator's
Acceptance Log.
Figure 20 Acceptance Log Standby Screen 1
4. The LCD Screen will display a Progress Bar
while the Acceptance Log is being read
(See Figure 21).
NOTE: While reading the Acceptance
Log, NO Keyboard operations will be
accepted!
© 2013, Japan CashMachine Co., Limited
7
Screen once the
Key
OK
is pressed.
Power Switch ON, and an SD
" on the Function Selection
Key
to accept
OK

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for JCM GLOBAL DT-300 Series

This manual is also suitable for:

Bluewavedx

Table of Contents