Start And Design Of The User Interface; Initial Start Of The Operation - Siemens SICAM Q100 7KG95 Series Manual

Class a power quality instrument and power monitoring device
Hide thumbs Also See for SICAM Q100 7KG95 Series:
Table of Contents

Advertisement

9.2

Start and Design of the User Interface

9.2.1

Initial Start of the Operation

Before starting the user interface, the following preconditions must be satisfied:
Assemble the SICAM Q100 as described in chapter 7.2.
Connect the lines for measurement, communication and supply voltage as described in chapter 7.3 and
observe the safety provisions.
Switch on the devices needed for the measurement.
Switch on the supply voltage of the SICAM Q100.
Check whether the LEDs at the SICAM Q100 indicate that the device is ready (see chapter 13.2).
Match the IP address and the subnet mask of the network interface card of your computer to the device
settings.
Check on the computer screen whether the LAN connection is up. Activate the LAN connection if it is down
(see the Windows manual or the Windows online help for information).
For checking purposes, carry out the ping test as follows (example for Windows):
Click Start on the Windows interface.
Select Execute....
Enter cmd in the dialog and click OK.
Enter: ping 192.168.0.55.
Press ENTER.
Check the following output in the window.
Figure 9-1
Start the Web browser.
Enter the IP address in the Web browser (for example default IP address: https://192.168.0.55) of
SICAM Q100 and press ENTER.
The user interface opens with the Information tab -> Show device information (see Figure 9-8).
SICAM Q100, 7KG95xx, Device Manual
E50417-H1040-C522-A6, Edition 06.2019
Ping Test
9 Operation at Use of a PC
9.2 Start and Design of the User Interface
139

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents