Fan; Gas Valve; Expansion Vessel Removal - Worcester Greenstar i System ErP Series Installation, Commissioning And Servicing Instructions

Wall hung rsf gas fired condensing system boiler
Table of Contents

Advertisement

Service and spares

7.7.16 Fan

Remove the fan assembly as described in section 7.7.4.
Refer to figure 85
▶ Remove two screws retaining the fan to the air/gas manifold [1].
▶ Remove the air/gas manifold [1].
▶ Remove the gas inlet tube [3].
▶ Remove the air inlet tube [4].
1
4
Fig. 85 Dismantling the fan assembly
Refer to figure 86
▶ With a terminal screwdriver at the point indicated [7] carefully lever
over the stop point [6].
▶ Rotate the mixing unit in the direction indicated to release.
▶ Remove the mixing unit from the fan.
6
Fig. 86 Mixing unit removal
Re-assemble with new fan ensuring mixing unit and seals are correctly
fitted.
60
2
3
5
7

7.7.17 Gas valve

Refer to figure 87
▶ Isolate gas supply at appliance gas cock.
▶ Disconnect the electrical connection from the valve.
▶ Remove wire clip [2] from gas valve outlet.
▶ Pull the gas pipe [1] free from the gas valve.
▶ Undo the bottom gas pipe connection [3].
▶ Remove the two screws securing the bracket and remove gas valve
from appliance.
1
2
3
Fig. 87 Gas valve upper connection
▶ When replacing gas valve, fit in reverse order.
▶ Check all the gas connections for gas tightness.

7.7.18 Expansion vessel removal

Refer to figure 88
▶ Ensure the appliance is isolated and fully drained.
▶ Loosen the retaining bracket screws [1], they do not need to be
removed.
▶ Undo the connection pipe [2].
▶ Pull the expansion vessel free from the appliance.
Re-assemble with new expansion vessel ensuring that:
– Align expansion vessel connection with nut ensuring the
replacement washer on connection pipe has been fitted.
– Secure expansion with clamps, taking care not to over tighten the
screws.
89
1
2
1
Fig. 88 Expansion vessel removal
Greenstar i System
- 6 720 806 945 (2015/07)
ErP

Advertisement

Table of Contents
loading

Table of Contents