Leak Test; Safety Procedures - probst SPEEDY VS-140/200 Operating Instructions Manual

Vacuum hand laying device
Hide thumbs Also See for SPEEDY VS-140/200:
Table of Contents

Advertisement

Maintenance
9.4

Leak Test

9.5

Safety procedures

It is the contractor's responsibility to ensure that the device is checked by an expert in periods of
·
max. 1 year and all recognized errors are removed (à see BGR 500).
The corresponding legal regulations and the regulations of the declaration of conformity have to be
·
observed!
We recommend that after checking the device, the badge "Safety checked" is put on the device.
·
(Order-No.: 2904.0056+inspection sticker with date).
You can receive these badges from us.
The check by an expert must be proved!
Device
Year
5270.0011/5270.0012/5270.0013/5270.0014
Check the device for leaks at least every three months.
Apply the suction pad to a flat air-tight surface.
Switch the vacuum blower on and wait until a vacuum of at least -200 mbar
is reached.
If this vacuum level is not reached, check:
whether the seals or hoses are damaged,
that the connectors are tight,
that the filter element is clean.
Date
V3
Expert
24 / 25
Company
GB

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents