3 ISC and ICC Construction Requirements

This section describes the special consideration of Integrated System Cabinet (ISC) and
Integrated Cooling Cabinet (ICC).
Specification of Floor under ISC and ICC:
1. Floor slope: < +/- 0.5 deg ( < +/- 8.7mm / m)
2. Floor surface: < +/-5mm in Cabinet installation area
3. Do not place the carpet under the cabinets
NOTE:
Dimensions are in inches. Bracketed dimensions are in millimeters.
4. Floor level at Cabinet Rear side (near wall) must be equal or slightly higher than floor level
of Cabinet Front side. (0 ≦ θ < 0.5 deg)
Chapter 4 Equipment Room
Illustration 4-11: Area to be leveled
Illustration 4-12: Slope Specification
SIGNA Voyager Pre-Installation
Direction 5680008–1EN, Revision 2